Standup M-Set ME Research Cost Optimization I

Structure Tech I Medium Structure Engineering Rigs

Standup M-Set ME Research Cost Optimization I — Structure Tech I Structure Engineering Rig M - ME Research Cost Optimization (Structure Module) — EVE Online item

The Standup M-Set ME Research Cost Optimization I rig provides a means for structure operators to decrease cost requirements when performing material efficiency research in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price113.50mISK
90d Avg106.41mISK
Volume10m³

Jita Market (90d)

Latest Price (2026-11-14)113.50m ISK
90d Average106.41m ISK
90d High124.00m ISK
90d Low100.00m ISK
Avg Daily Volume2

Variations(2)